Our successful partnership brought confidence to the team of consultants and Engineer’s within Prime Technologies, which secured a similar package on the most prestigious World’s tallest building – The Burj Tower.
Our products are installed in five of the highest plant rooms in the world, and serve a multiple of high efficiency boilers, manufactured by a European company.
The Midtherm PS Vee band pressurised system is constructed using 1mm thick twin wall 316 grade stainless steel fully-welded inner liner and outer casing, complete with 128kg/m3 high quality mineral wool fibre. The PS system carries certificates for 4 hour fire rating, BS EN 1856-1:2003 & BS EN 1443:2003.