Find products

Use our product finder to search for products and materials

Subscribe to our newsletter to receive news about events and exhibitions, innovation and materials on the latest building product innovations, case studies and more.
I have read and agree to the terms and conditions of usage and The Building Centre's Privacy Policy.

City Hall, London

14 Oct 2011
Case study
City Hall is a distinctive glass globe, with a purpose built assembly chamber and offices for GLA staff. The building is 45 metres high, with 185,000 sq ft (gross) of floor space spread over 10 floors. The building has no front or back: its shape is derived from a geometrically modified sphere.

It is a unique and unusual building. Nothing quite like this structure had been constructed before and its challenging shape demanded innovative solutions at every level. City Hall is also one of the most energy efficient and sustainable structures in the capital.

A Lytag® lightweight aggregate 8:1 (by volume) no-fines screed with a 4:1 (by weight) cement: sand topping was used on the floors thus reducing the screed density by approximately half and helping with the sustainability requirements.